Training on Repairing the Winding Coil of a 1-Phase Electric Water Pump Motor

Main Article Content

  Catra Indra Cahyadi
  Usman Usman
  Hairul Amren
  Inda Tri Pasa
  Fauziah Nur
  Ivana Wardani
  Angga Amanda Putra
  Ronaldo Samosir

Abstract

Training skills and how the steps are learned as a learning activity for trainees, as well as starting from the theory about electric motors and practicing sequentially. Understanding each material given in the module is also needed to identify the coil winding of a 1 phase electric motor, especially a water pump. Learning activities are equipped with exercises or evaluations that become a benchmark for the training participants' mastery level. Trainees are expected to understand the explanation from the teaching team so that they can understand well the material that is the basis of repair planning, installing winding sleeves at Cern, winding copper email wire windings to mall boards, attaching windings to the grooves of water pump motors, connecting the main and auxiliary winding coils, tying the windings with nylon thread After finishing winding the wire coil, close the water pump motor that is ready to be rolled again and then test the motor that has been completed in rolling again. After participating in all learning activities in this training, participants are expected to follow the procedures from the planning stages of rolling, installing coil windings, and reinstallation for the quality of winding coils, with good quality and neatness.

Downloads

Download data is not yet available.

Article Details

How to Cite
Cahyadi, C. I., Usman, U., Amren, H., Pasa, I. T., Nur, F., Wardani, I., Putra, A. A., & Samosir, R. (2023). Training on Repairing the Winding Coil of a 1-Phase Electric Water Pump Motor. DIKDIMAS : Jurnal Pengabdian Kepada Masyarakat, 2(3), 151–160. https://doi.org/10.58723/dikdimas.v2i3.216
Section
Research Articles

References

Anthony, Z. (2018). Kajian Pengembangan Lilitan Motor Induksi 1-Fasa Dengan Bentuk Lilitan 4-Fasa (Studi Kasus: Daya Keluaran dan Faktor Daya). Jurnal Teknik Elektro ITP, 7(2), 95–100. https://doi.org/10.21063/jte.2018.3133713

Anthony, Z., & Erhaneli, E. (2018). Desain Lilitan Motor Induksi 1-Fasa dengan 4 Kumparan yang Tidak Identik Sama. Eeccis, 12(2), 89–92. https://doi.org/10.21776/jeeccis.v12i2.549

Anthony, Z., & Erhaneli, E. (2020). Kinerja Motor Induksi 1-fasa Disain 4 Kumparan dengan Kapasitansi Kapasitor Jalan Terkendali. Elkha: Jurnal Teknik Elektro, 12(1), 7–12. https://doi.org/10.26418/elkha.v12i1.37857

Anthony, Z., Saputra, A. A., Arif, M., & Aulia, F. (2019). Kajian Penggunaan Sistem Kendali Pwm Untuk Mengontrol Arus Kumparan Bantu Motor Induksi 1-Fasa. In Seminar Nasional Peranan Iptek Menuju Industri Masa Depan (PIMIMD-5). https://doi.org/10.21063/PIMIMD5.2019.20

Fauzi, A., Aisuwarya, R., & Aisuwarya, R. (2020). Sistem Kendali Jarak Jauh dan Monitoring Penggunaan Listrik pada Pompa Air melalui Smartphone. JITCE (Journal of Information Technology and Computer Engineering), 4(01), 32–39. https://doi.org/10.25077/jitce.4.01.32-39.2020

Fauzi, A. F., & Irianto, C. G. (2021). Rancang Bangun Kursi Getar Peningkat Fokus pada Masinis MRT Jakarta menggunakan Motor Induksi Satu Fasa 50 Watt berbasis Arduino UNO. Kocenin Serial Konferensi, 1(1), 2–8. Google Scholar

Gunawan, I. (2013). Panduan Menggulung Ulang Kumparan Motor Listrik Satu Fasa. Yogyakarta: Andi Offset.

Hidayat, F. A. (2020). Unjuk Kerja Motor Brushless Direct Current Axial Flux 3 Fasa Stator Ganda Terhadap Perbedaan Jenis Kawat Enamel Pada Kumparan Stator. Dielektrika, 7(2), 94–105. https://doi.org/10.29303/dielektrika.v7i2.244

Indraswari, R. R., & Yuhan, R. J. (2017). Faktor-Faktor Yang Memengaruhi Penundaan Kelahiran Anak Pertama Di Wilayah Perdesaan Indonesia: Analisis Data Sdki 2012. Jurnal Kependudukan Indonesia, 12(1), 1–12. https://doi.org/10.14203/jki.v12i1.274

Irvawansyah, I., & Rahmansyah, A. A. (2018). Prototype of Monitoring and Control System of SCADA-based Water Tank Level. JTT (Jurnal Teknologi Terapan), 4(1), 27–32. https://doi.org/10.31884/jtt.v4i1.88

Mardiana, A., & Saleh, A. (2022). Pemberian Reward Terhadap Peningkatan Motivasi Kerja Karyawan Dalam Perspektif Islam. MUTAWAZIN (Jurnal Ekonomi Syariah), 2(1), 1–14. https://doi.org/10.54045/mutawazin.v2i1.112

Pemerintah Kabupaten Deli Serdang. (2019). Visi dan Misi Kabupaten Deli Serdang Tahun 2019 - 2024. Pemerintah Kabupaten Deli Serdang. https://portal.deliserdangkab.go.id/visi-misi.html

Setiadi, I. (2018). Perancangan Sistem Kontrol Otomatis Air Baku Dan Air Produksi Pada Unit Arsinum Smk Al-Kahfi Kabupaten Sumbawa. Jurnal Rekayasa Lingkungan, 10(2), 91–98. https://doi.org/10.29122/jrl.v10i2.2849

Sihombing, P. (2023). Prototipe Pengawasan Suhu secara Real-Time dan Pengontrolan Dua Motor Listrik secara Otomatis Berbasis IoT. Elektriese: Jurnal Sains Dan Teknologi Elektro, 13(01), 83–94. https://doi.org/10.47709/elektriese.v13i01.2723

Tampubolon, K., Alinur, A., Elazhari, E., Ermawy, A., & Manurung, R. S. (2021). Penyuluhan Tentang Mengenal Mesin Pompa Air dan Cara Perawatannya di Serikat Tolong Menolong Nurul Iman (STMNI) Kelurahan Timbang Deli Kecamatan Medan Amplas. Journal Liaison Academia and Society (J-LAS), 1(2), 1–8. https://doi.org/10.58939/j-las.v1i2.192

Usman, U., Dwiyanto, D., Panjaitan, A., Amren, H., & Sihombing, P. M. (2023). Pelatihan menggulung ulang kumparan motor listrik Alternating Current 1 phasa di Kelurahan Jati Makmur Kecamatan Binjai Utara. Jurnal Derma Pengabdian Dosen Perguruan Tinggi (Jurnal DEPUTI), 3(1), 134–139. https://doi.org/10.54123/deputi.v3i1.235